Construction Timeline

In the walls · 3–7 days

Insulation

Air sealing and insulation are installed in every cavity, then verified before drywall covers them. This is the last moment the envelope is visible, and the single largest permanent influence on comfort and utility cost.

Checklist

Insulation checklist

Checked items are saved on this device and update your milestone progress.

0 of 5 complete0%

Coverage

Air sealing

5 items left before you can mark this reviewed.

Questions to ask

  • What R-value is installed in walls, ceilings, and the garage-to-house wall?
  • Where is air sealing applied — top plates, rim joists, penetrations, can lights?
  • Is a blower-door test performed, and can I see the result?
  • Who inspects insulation coverage before drywall is scheduled?
  • If I upgraded the package, what specifically changed versus the base spec?

Inspection tips

  • Schedule any independent inspection before drywall is delivered, not after.
  • Walk the home with a flashlight — gaps read as shadows in cavity corners.
  • Ask for the insulation certificate listing installed R-values by assembly.

Common mistakes here

  • Assuming the municipal inspection judges insulation quality rather than code minimum
  • Declining the envelope upgrade on sticker price without comfort and utility math
  • Missing the window entirely because drywall was scheduled early

Learn

Videos

  • What to look for at an insulation walkthroughIn production

What happens next

Drywall goes up and the walls close permanently.

Next milestone: Drywall